24-hour Service Hotline : 0533-8678777 Company Address : No. 5, nanzhi first road, science and technology industrial park, zibo city Purchasing Department: 15805338006(AN) E-mail:sdphkj@163.com Home Page:www.givvabit.com
The traffic light is blown down or the base is not big enough
Urban traffic signal condition: running guesthouse lamp post, united lamp post, bai tuba road and xihe road junction, bai tuba road and jade guide junction;
The traffic facilities are damaged: the barrier of the west river north road is about 3040 meters, and the three-bridge shunqing bridge head is down, and the traffic is more congested along the route.
Safety hazards: the road of the spring road, the main crossing of the tiangong street, and the trees at the gate of taihe shangdu.
Water deeper section: south road, along the metropolitan citizens central garden, citizens north road viaduct - goldfish ridge direction under the bridge, yu ying road, zhengyang road, peace road, welling China along the industrial park;
Traffic jam: south road - five - star garden, civil road - five star garden, two-way street; (south - north) walking along the road, peace road - in spring lamp post, lianchi two-way - wantai lamp post, yu ying road and railway stations surrounding roads, welling China industrial park - white earth dam road, yan an, the long march road and xizang road.
Heavy rain caused widespread blackouts in urban areas. Reporter from its nanchong electric power supply company, due to the instantaneous thunderstorms form of distribution network line, power supply company emergency workers are preparing to travel to find something wrong with blackout area, once find fault point, will be the first time to restore power.